Minutes - March 22nd 2012

From LHEP Wiki
Revision as of 15:27, 23 March 2012 by Lhep (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Particpants: Aki, Eike, Fatih, Hieho, Martti


T2K collaboration meeting in April:

- Eike (18.4. - 4.5.), Hieho (18.4. - 26.4.), Martti (18.4. - 1.5.) and Aki (19.4. - 26.4.)

- Eike, Hieho and Martti fly together


Fatih - LEM shifts:

- presentation shown by Fatih [1]

- maybe losening of shift rules in near future

- next 2 weeks cancelled due to LINAC failure

- March 3rd - 12th: beam power was ~115kW (not very stable)


Work status of Fatih:

- presentation shown by Eike on March 1st [2]

- comments from LEM collaboration: efficiency and FV cuts need to be understood in more detail

- 20'000 events from new MC (nu interaction, produced ~1 month ago), work in progress

- time conflict writing thesis vs. development of analysis tools

- first draft needs to be ready by end of May (defense: September 28th)

- plan of install LEM software on lheppc88 next week to share work load


ND280 and magnet shifts:

- Eike will show everything to Hieho and Martti during coll. meeting


ND280 software:

- Hieho and Eike set up server in for T2K Bern (lheppc88, now in Montageraum)

- Next steps: install ND280 software, now trying to get analysis packages running


AOB:

- new scheduler on google calenders (Hieho and Eike take care)