B7
General Informations
- brick 7 of the Pi/Mu separation
- Pions with 0 mrad angle
- 1564 predictions scanned from plate 4..38
To Do
- merge sbt-files - OK
- start to analyse
Status
- working directory: MICROSCOPE1/ONLINE/b000007/ (light level: 30000, cut off: 0: 1200, 1: 1100)
- plate 1..3 scanned DSET 12 Areas
- prediction produced
- alignment problems between plate 3-4 (-> rotated by 180°)
- test with 4..6 2cmx2cm succsessfull performed, scanback for 5 plates
- plate 4..6 scanned for new prediction scan DSET456 12 Areas
- link all files, make intercalibration of 12 zones, new RCUT in pre-and full-alignment: RCUT 0 abs(s.eTX)>0.01&&abs(s.eTY)>0.01
- predictions from plate 4-6: 1563 with cut: pred_abs(s.eTX)<0.05&&abs(s.eTY)<0.05&&!(abs(s.eTX-0.048)<0.008&&abs(s.eTY-0.001)<0.008).txt: Because there is lead between the emulsion, the stronger cut nseg==3 was not applied (there are already fewer prediction than expected).
- predictions (1563): all tracks XY, all tracks TXTY, pred XY, pred TXTY
- One area finished check_summary(), check_path()
- ON: scanning of area 2..16
- Crashed at pl 20, but in fact plate 19 is on the table...checking.. Corrected ChangerStatus.txt
- Restarted from plate 20 (FROM_PLATE=19, scanback_batch();)
pl29..so far so good..
27.06.08 Finished.
Problems
- plate 1..3 is rotated by 180° in respect to the other plates
- new totalscan for plate 4..6 in order to produce predictions