Production of ArCLights
Jump to navigation
Jump to search
Listed below are several documents and links from previous students for the ArCLight production. Many of the links are to our Argoncube google drive.
From the Summer Students in 2023 the following documents are around:
- Summer Students 23, Production Run 3, Settings table
- Summer Students 23, Production Run 3, Written guide for ACL production Note: This guide was with the old laminating machine and is not up to date.
- Summer Students 23, Production Run 3, ACL tests
The documentation from 2024 are listed below. The ACL's produced in 24 are the ones that were used in the FSD1 run.
- Google drive for 2024 ACL production The files from the summer students. The PDF for the step by step instruction to produce an ACL (most up to date) are listed there.